Control Circuit Cables And Connectors - Mitsubishi Electric MDS-B-SPJ2 Series Specification Manual

Ac spindle drive unit
Table of Contents

Advertisement

5.7 Control circuit cables and connectors

• Use cables (3) and (4) for the detector cables, after confirming the spindle motor series and
necessary wiring length. Also use cable (5) when an encoder is installed externally.
• Use the detector connector sets (4) and (5) to manufacture a detector cable, referring to "5.
Connections" for details.
• Connect the terminator (2) to CN1B of the last spindle amplifier.
MDS-B-SVJ2
NC
CN1A
(1)
CN2 CN3
Optional cables (1/2)
Product name
NC-Amplifier
(1)
CN1A
Amplifier-Amplifier
and
Bus cable
CN1B
(2)
Terminator
5. Connections
MDS-B-SPJ2
CN1B
CN1A
(1)
CN2 CN3
Model
SH21 or
FCUA-R000
A-TM
FCUA-A-TM
Note) A battery unit is required in absolute position systems.
(2)
Terminator
CN1B
(1)
(6)
(3)
(7)
(4)
(5)
Amplifier side connector (3M
or equivalent product)
10120-3000VE (connector)
10320-52F0-008 (shell kit)
5 − 16
Battery unit
Encoder
Details
Amplifier side connector (3M
or equivalent product)
10120-3000VE (connector)
10320-52F0-008 (shell kit)
SJ-P Series motor
SJ-PF Series motor

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents