Mitsubishi Electric MDS-B-SPJ2 Series Specification Manual page 6

Ac spindle drive unit
Table of Contents

Advertisement

(5) Troubleshooting
If a dangerous situation is predicted during a stop or product fault, take prevention measures by
installing an external brake mechanism to hold the tool.
When an alarm occurs, always eliminate the cause of the alarm and ensure safe operation before
resetting.
Never go near the machine after restoring the power after a failure, as the machine could start
suddenly. (Design the machine so that personal safety can be ensured even if the machine starts
suddenly.)
(6) Maintenance, inspection and part replacement
The capacity of the electrolytic capacitor will drop due to deterioration. To prevent secondary
damage due to faults, replace the capacitor every ten years when using under a general
environment. Consult the Service Station or Service Center for replacements.
(7) Disposal
Treat this unit as general industrial waste.
(8) General precautions
The drawings given in this Specification Manual show the covers, safety partitions, etc., removed to
provide a clearer explanation. Always return the covers and safety partitions to their specified locations
before operating this product, and operate following the Instruction Manual.
CAUTION
CAUTION
CAUTION
CAUTION

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents