Komatsu PC200-8M0 Shop Manual page 978

Table of Contents

Advertisement

SEN06143-00
2.
Install dust seal (17).
a Check the installed dimension (L).
Installed dimension (L): 12 ± +0.1/0 mm
3.
Vibration damper
1)
Match dowel pin (a) to dowel pin hole, and
install vibration damper (13).
2)
Tighten mounting bolts (15) according to
the following procedure.
1]
Tighten the bolts diagonally with a
torque of 55 ± 5 Nm {5.6 ± 0.5 kgm}.
2]
Loosen bolts by 180 degrees.
3]
Tighten the bolts diagonally with a
torque of 55 ± 5 Nm {5.6 ± 0.5 kgm}.
4]
Using tool A6 and retighten the bolts
by 90 ± 5 degrees.
16
50-200
200 Engine and cooling system
Removal and installation of engine front oil seal
a When angle tightening tool A6 is not
used
5]
After above steps 1] to 3] are finished,
put a paint mark across vibration
damper (13) and mounting bolts.
6]
Retighten the bolts by 90 ± 5 degrees.
PC200, 200LC, 220, 220LC-8M0

Advertisement

Table of Contents
loading

This manual is also suitable for:

Pc200lc-8m0Pc220-8m0Pc220lc-8m0

Table of Contents