Komatsu PC200-8M0 Shop Manual page 1027

Table of Contents

Advertisement

300 Power train
Disassembly and assembly of final drive assembly
a After assembling the No.1 plane-
tary carrier assembly, check that
No.1 planetary gear (8) rotates
smoothly.
a After the pin is inserted, stake the
pins (C) on the carrier at 2 loca-
tions.
2)
Install No.2 planetary carrier assembly (3).
PC200, 200LC, 220, 220LC-8M0
14. Washer
Install washer (2).
a After installing washer (2), measure dis-
tance (i) from the top of No.1 planetary
gear (8) to the top of ring gear (12) and
check the assembly condition.
a If dimension (i) is not within 0.54 ± 0.56
mm range, they are not assembled cor-
rectly. In this case, check again.
SEN06144-00
11
50-300

Advertisement

Table of Contents
loading

This manual is also suitable for:

Pc200lc-8m0Pc220-8m0Pc220lc-8m0

Table of Contents