ABB PSTX Series Installation And Commissioning Manual page 13

Hide thumbs Also See for PSTX Series:
Table of Contents

Advertisement

INFORMATION
The ground is not a protective ground, it is a
functional ground. The maximum length of the
ground cable is 0.5 m. Connect the ground cable
to the installation plate were the Softstarter is
attached. The installation plate must also be
grounded.
INFORMATION
Do not use functional ground in IT-networks, commonly
found in for instance marine applications.
6.
Look at the diagram, see Figure 2.7, and connect
the start/stop circuits: terminal 13, 14, 18, 19 and
20/21, with the internal 24 V DC terminal. When
you use internal 24 V DC (terminals 20 or 21), the
terminals 18 and 19 must be connected to each
other. For external control circuit voltage,
see
chapter
5.1.2.3 Start and Stop - terminals
13, 14, 18, 19, 20,
21.
WARNING
Use 24 V DC only when you connect terminal 13, 14,
15, 16 and 17. Other voltages can cause damage
to the Softstarter and the warranty will no longer be
valid. For more information about terminal 15, 16 and
17, see
chapter
5.1.2.4 Programmable inputs -
terminals 15, 16 and
7.
Connect terminals 4, 5, 6, 7, 8, 9, 10, 11 and
12 to use the signal output relays. These are
potential-free contacts for maximum 250 V AC,
1.5 A AC-15 and 30 V DC, 5 A DC-12.
See Figure 2.5.
8.
Make sure that the operation voltage and control
supply voltage agree with the Softstarter ratings.
9.
Set the control supply voltage switch to ON.
10.
The green Ready LED is constant lit if the following
conditions are fulfilled:
- Control supply voltage is detected
- Mains three phase voltage is detected
- Mains frequency is within range (40-72Hz)
- Motor connection is detected
- Phase sequence is detected
- No events are active
- Enable signal is active
- If the max nbr of starts per hour function is
enabled and set to stop manual or stop automatic,
the remaining time to start counter (which can be
shown in the HMI homeview) has to be zero
Otherwise the ready LED is flashing, see Figure
2.6.
11.
The language settings appear on the screen.
Select your language and push the selection soft
key "OK". The HMI now downloads the language
data from the Softstarter. This can take some
minutes. When this is done the HMI shows the
Home view.
12.
Configure applicable parameters as given in
chapter
7 Functions or use the assistants as
given in
chapter
2.2 Configuration.
17.
1SFC132081M0201
Figure 2.4
Functional ground, terminal 22
L1
L2
L3
N
L N
KM1
1L1 3L2 5L3
1
2T1 4T2 6T3
U
W
V
M
3
Figure 2.7
Circuit diagram (Fuse and contactor version)
L1
L2
L3
N
L N
1L1 3L2 5L3
1
2T1 4T2 6T3
U
V
W
M
3
Figure 2.5
Circuit diagram ( MCCB version)
L
N
100-250V
50/60 Hz
K4
K4
K4
Start Stop Reset In1 In2 DGND DND +24V GND
PSTX
Figure 2.6
Flashing "Ready" LED
| Installation and commissioning manual | Quick start
Start
Stop
13
14
18 19
20
22
Star
t
24 V DC
Stop
2
13
14
15 16 17
18
19 20
21
22
4
5
6
7
8
9
10
11
12
Start
Stop
13
14
18 19
20
22
Star
t
24 V DC
Stop
2
13
14
15 16 17
18
19 20
21
22
22
4
5
6
7
8
9
10
11
12
2
13

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents