Installing Additional Modules - GE VersaMax PLC User Manual

Table of Contents

Advertisement

4.5 Installing Additional Modules

Connector Cover
Installation
For public disclosure
A CPU or Expansion Receiver Module can serve up to 8 additional I/O and option
modules on the same section of DIN rail. Power must be off before adding a carrier to the
rack.
Before joining carriers to the CPU or ERM, remove the connector cover on the righthand
side of the CPU/ERM. Do not discard this cover; you will need to install it on the last
carrier. It protects the connector pins from damage and ESD during handling and use.
Do not remove the connector cover on the lefthand side.
Install each carrier close to the previously-installed carrier, then slide the properly-aligned
carriers together to join the mating connectors. To avoid damaging the connector pins, do
not force or slam carriers together.
DIN-rail clamps (available as part number IC200ACC313) should be installed at both
ends of the station to lock the modules in position.
Connector Cover
GFK-1503E User Manual 59

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents