Cable Installation Process; Figure 15-23 Cable Connections (+24 V Dc) - Huawei DBS3900 Installation Manual

Indoor centralized rack (icr) dual-mode base station
Hide thumbs Also See for DBS3900:
Table of Contents

Advertisement

15 Installing Cables

Figure 15-23 Cable connections (+24 V DC)

15.3 Cable Installation Process

This section describes the process of installing the ICR-related cables.
Process of Installing the ICR-Related Cables
Figure 15-24
15-46
shows the cable installation process.
Huawei Proprietary and Confidential
Copyright © Huawei Technologies Co., Ltd.
DBS3900(ICR)
Installation Guide
Issue 01 (2011-03-30)

Advertisement

Table of Contents
loading

Table of Contents