Reference Documents; Preparing Tools And Instruments - Huawei LampSite Installation Manual

Hide thumbs Also See for LampSite:
Table of Contents

Advertisement

LampSite
Installation Guide

2.1 Reference Documents

Before the installation, you must read the following documents:
l
l
For details about how to install a baseband unit (BBU), see DBS3900 Installation Guide.

2.2 Preparing Tools and Instruments

This section describes the tools and instruments that must be prepared before the installation.
Marker
Level
Power cable crimping tool
Rubber mallet
Hammer drill (Ø6,Ø8 and
Ø12)
Guarded blade utility knife
Issue 02 (2014-05-27)
LampSite Hardware Description
Installation Reference
Huawei Proprietary and Confidential
Copyright © Huawei Technologies Co., Ltd.
Torque screwdriver
(M4 to M6)
RJ11 crimping tool
T20 torque torx screwdriver
Torque wrench (Ø10 mm)
ESD gloves
2 Installation Preparations
Diagonal pliers
Cable cutter
Wire stripper
Protective gloves
Long measuring tape
5

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents