Installing Rhub Cables; Requirements For Cable Layout - Huawei LampSite Installation Manual

Hide thumbs Also See for LampSite:
Table of Contents

Advertisement

LampSite
Installation Guide
Figure 4-26 Installing an RHUB on a wall
----End

4.4 Installing RHUB Cables

This section describes how to install cables for an RHUB.

4.4.1 Requirements for Cable Layout

Cables must be routed according to the specified cabling requirements to prevent signal
interference.
General Requirements for Cable Layout
Bending radius
Issue 02 (2014-05-27)
NOTE
As shown in the preceding figure, when the RHUB is placed against the wall, ensure that the RHUB panel
is vertical to the ground and the PSU is on the lower part of the RHUB panel.
NOTE
If a cable listed below is not required, skip the requirements for routing the cable.
Huawei Proprietary and Confidential
Copyright © Huawei Technologies Co., Ltd.
4 Installing an RHUB
28

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents