Motor Assy., Pg; Sheet, Ink, Stopper, C Release - Epson Stylus Pro 4400 Service Manual

Hide thumbs Also See for Stylus Pro 4400:
Table of Contents

Advertisement

EPSON Stylus Pro 4400/4450/4800/4880/4880C

4.2.7.4 Motor Assy., PG

1.
Remove "Cover, Side, Right" (p217).
2. Peel off the acetate tape and release the tab at the lower part of the
"Sheet, Ink, Stopper, C" from the U-shaped cutout of the "Frame, Base,
Side, Right".
(Refer to Figure 4-89.)
3. Disconnect relay connector.
(Refer to Figure 4-90.)
4. Remove the acetate tape securing the harness, and release "Harness,
CSIC" and "Motor Assy., PG" harness from "Duct, Air, C" hook.
(Refer to Figure 4-90.)
5. Release "Motor Assy., PG" harness and "Mount Assy., Plate, Motor, ASF,
SP" harness from the U-shaped cutout of the "Frame, Base, Side, Right".
(Refer to Figure 4-90.)
6. Peel acetate tape and release "PG Motor" harness.
Disassembly & Assembly
Frame, Base, Side, Right
(Refer to Figure 4-90.)
Motor Assy., PG Harness
Disassembly Procedures
Sheet, Ink, Stopper, C
Figure 4-89. Sheet, Ink, Stopper, C Release
Step 4
Harness, CSIC
Figure 4-90. Releasing the Harness
Revision C
Step 3
Duct, Air, C
274

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents