Mitsubishi Electric GOT 1000 Series Manual page 136

Graphic operation terminal
Hide thumbs Also See for GOT 1000 Series:
Table of Contents

Advertisement

(8) Multi select setting
A click on the
Complete the setting, referring to the following explanation.
(a) Specify the maximum number of acquiring records
If the [Specify the maximum number of acquiring records] checkbox is checked, records of up to the
specified number are acquired.
The GOT acquires the records in the order that the records are extracted from the database.
When selecting this, set a tag for which a value is specified.
1) Tab/Type
Select a tag for which a value is specified.
Tags that have a tag component with [Array setting] cannot be selected.
2) Component
Select or directly enter a component or a constant value to be specified.
[Number]
Device tag
POINT
POINT
POINT
(1) When the select sort settings are set, the GOT acquires the records in the set sorting orders.
(2) An error occurs if the specified tag component value is 0 or less.
Section 5.3 (2) When an error occurs in job execution
(b) Send notificcation of selected record number
When the [Notify the number of acquired records] checkbox is checked, the number of actually acquired
records is notified to the specified tag component.
When selecting this, set a tag component to which a value is notified.
• Tag
Select a tag component to which a value is notified.
Tags that have a tag component with [Array setting] cannot be selected.
6 - 60
6.8 Job Settings - Actions
Multi select setting
button displays the [Multi select setting] dialog box.
Item
Within the range of 1 to 40000
Single- or double-precision type tag component
Values available for Component

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents