Install the Cisco Catalyst 8300 Series Edge uCPE
Figure 10: 19 inches or 23 inches Bracket Installation for Front Mounting
1
2
3
Brackets have optional securing locations so they can be mounted flush to the I/O-face or recessed from the
face when RFID is provisioned. The following image shows the brackets secured to the I/O-face in the recessed
position (RFID is applied). If flush securing is desired, slide the bracket forward and secure the other 4
bracket-securing holes.
Note
Recessed mounting is not supported on the PSU-face.
Installing the Cisco Catalyst 8300 Series Edge uCPE
23 inches Rack Mount brackets
19 inches Rack Mount brackets
Securing screws
Cisco Catalyst 8300 Series Edge uCPE Hardware Installation Guide
19