Cisco Catalyst 8300 Series Hardware Installation Manual page 23

Edge ucpe
Hide thumbs Also See for Catalyst 8300 Series:
Table of Contents

Advertisement

Install the Cisco Catalyst 8300 Series Edge uCPE
Figure 10: 19 inches or 23 inches Bracket Installation for Front Mounting
1
2
3
Brackets have optional securing locations so they can be mounted flush to the I/O-face or recessed from the
face when RFID is provisioned. The following image shows the brackets secured to the I/O-face in the recessed
position (RFID is applied). If flush securing is desired, slide the bracket forward and secure the other 4
bracket-securing holes.
Note
Recessed mounting is not supported on the PSU-face.
Installing the Cisco Catalyst 8300 Series Edge uCPE
23 inches Rack Mount brackets
19 inches Rack Mount brackets
Securing screws
Cisco Catalyst 8300 Series Edge uCPE Hardware Installation Guide
19

Advertisement

Table of Contents
loading

Table of Contents