Honeywell BW MicroDock II Quick Reference Manual page 8

Automatic test and calibration station
Table of Contents

Advertisement

MicroDock II
Quick Reference Guide
Item
1
Inlet filter assembly
2
C-cell batteries (4)
3
Battery cover
4
Philips pan head retaining screws (2)
5
MultiMediaCard (MMC)
6
Battery compartment
7
Charger port
8
USB port
9
Power port
10
Exhaust outlet
11
Gas cylinder
12
Demand flow regulator
13
Calibration gas hose
6
Description
a
Use the base station in a fresh air environment. Do not
use the base station in a hazardous area.
All required National Electrical Codes (NEC) and safety
standards must be followed.
The base station can operate from either an electrical
power source or batteries. The batteries will provide
automatic backup power if the main power fails.
1.
Connect the power cord to the POWER port on the
base station, and then plug the cord into an AC outlet.
To install the batteries, refer to
2.
Connect the charger cord to the CHARGER port on
the base station first, and then plug the cord into an
AC outlet.
3.
Attach all gas connections. Inlet 1 (PURGE) is config-
ured for ambient air and inlets 2-5 are configured for
calibration/test gases. Refer to
4.
A demand flow regulator must be used with all gas
cylinder connections.
5.
Ensure the exhaust line is not connected to a nega-
tive pressure system.
For AC main operation, the method to disconnect power is
to unplug the power cord from the outlet. A locking device
may not be used on the power cord plug.
Warning
Note
Battery
Installation.
Confirm Inlet
Setup.

Advertisement

Table of Contents
loading

Table of Contents