Calibration And Adjustments - GE LOGIQ E9 Service Manual

Hide thumbs Also See for LOGIQ E9:
Table of Contents

Advertisement

GE
D
5573152-100, R
IRECTION
8-7-4-4

Calibration and adjustments

No calibrations or adjustments are needed after this part replacement.
8-7-4-5
Verification
Perform the following steps to verify that the product is functioning as intended after this replacement:
1.) Verify that all screws removed earlier have been installed.
2.) If finished, connect cables and Probes removed earlier.
3.) Power up the system to verify that it operates as intended.
4.) Verify that there is no unusual noise from the Fan Assembly.
8-7-4-6
Functional Checks
Perform the following functional checks to confirm the system is operational before returning the system
to the customer.
If all are successful, include the following debrief script: LOGIQ E9 Service Manual, Direction
5573152-100, Rev. 2. Equipment passed all required checks and is ready for use.
See:
Section
4-2-2
4-2-3
4-3-13
4-3-5
4-3-7
4-3-17
8 - 200
. 2
EV
Table 8-126 Fan Assembly replacement Functional Checks
Functional Check
Power ON/Boot Up
Power shut down
Probe/Connectors Checks
B-Mode Checks
System CFM and PWD Checks
Mechanical Function Checks
Let the LOGIQ E9 run for 10 minutes and
observe that the Fans are running and
there are no errors reported by the
LOGIQ E9.
Section 8-7 - Main Console parts replacement
Debrief Script
LOGIQ E9 Service Manual, Direction
5573152-100, Rev. 2. Equipment passed all
required checks and is ready for use.
LOGIQ E9 S
M
ERVICE
ANUAL

Advertisement

Table of Contents
loading

Table of Contents