Calibration And Adjustments - GE LOGIQ E9 Service Manual

Hide thumbs Also See for LOGIQ E9:
Table of Contents

Advertisement

GE
D
5573152-100, R
IRECTION
8-6-5-3

Calibration and adjustments

No calibrations or adjustments are needed.
8-6-5-4
Verification
Perform the following steps to verify that the product is functioning as intended after this replacement:
1.) Power up the system to verify that it operates as intended.
8-6-5-5
Functional Checks
Perform the following functional checks to confirm the system is operational before returning the system
to the customer.
If all are successful, include the following debrief script: LOGIQ E9 Service Manual, Direction
5573152-100, Rev. 2. Equipment passed all required checks and is ready for use.
See:
Section
4-2-2
4-2-3
4-3-5
4-3-10
8 - 136
. 2
EV
Table 8-87
Probe Holder Insert replacement Functional Checks
Functional Check
Power ON/Boot Up
Power shut down
B-Mode Checks
Basic Measurements
Section 8-6 - Replacing Top Console Parts
Debrief Script
LOGIQ E9 Service Manual, Direction
5573152-100, Rev. 2. Equipment passed all
required checks and is ready for use.
LOGIQ E9 S
M
ERVICE
ANUAL

Advertisement

Table of Contents
loading

Table of Contents