DLP-G655 Route and Lock Cables
Figure 96: Cable Routing
b) Remove the front door and connect the copper cables to the SFP or RJ-45 ports of the cards.Do not route
the copper cables from the SFPs or RJ-45 ports through the fiber or cable module.
Step 4
To extract the power module, do the following:
a) Open the door of the chassis. See Diagram 2 of
page
b) Move the ECU cables away from the chassis. Ensure that the alarm cable with the plastic bend radius
controller is not moved. See Diagram 3 of
127.
c) Remove the power module. See Diagram 4 of
page
Installing the ONS 15454 M6 Shelf
126
127.
127.
Figure 97: Sequence to Remove the Power Module, on
Figure 97: Sequence to Remove the Power Module, on page
Figure 97: Sequence to Remove the Power Module, on