GE C70 Instruction Manual page 115

Capacitor bank protection and control system
Hide thumbs Also See for C70:
Table of Contents

Advertisement

4 HUMAN INTERFACES
3.
Remove the tool and attached user-programmable pushbutton label as shown below.
4.
Slide the new user-programmable pushbutton label inside the pocket until the text is properly aligned with the buttons,
as shown below.
b) STANDARD FACEPLATE
Custom labeling of an LED-only panel is facilitated through a Microsoft Word file available from the following URL:
http://www.gedigitalenergy.com/products/support/ur/GET-8494A.doc
This file provides templates and instructions for creating appropriate labeling for the LED panel. The following procedures
are contained in the downloadable file. The panel templates provide relative LED locations and located example text (x)
edit boxes. The following procedure demonstrates how to install/uninstall the custom panel labeling.
GE Multilin
C70 Capacitor Bank Protection and Control System
4.3 FACEPLATE INTERFACE
4-21
4

Advertisement

Table of Contents
loading

Table of Contents