Saturated Steam Application Probe Assembly
Saturated steam application is available with SLG726 rod and coax probes. The nut and
first inner rod segment have a larger diameter. The remaining hardware is identical. Refer
to
Figure 7
for saturated steam hardware. To assemble the probes, thread the saturated
steam application nut to the central conductor, tapered end towards the process connector.
For flanged process connectors, ensure the nut position is as shown in
lock washer between the locknut and the steam reference rod. Torque the connection to
15 Nm (11 ft-lbs). Proceed with the standard assembly procedures detailed above.