Switch> Enable - Cisco Catalyst 4500 series Administration Manual

Hide thumbs Also See for Catalyst 4500 series:
Table of Contents

Advertisement

How to Perform the ISSU Process
Perform the following steps at the active supervisor engine:
Command or Action
Step 1
Switch> enable
Step 2
Switch# issu changeversion [active-slot
active-image-new]] [standby-slot
[standby-image-new]] [at hh:mm | in hh:mm]
[quick]
Step 3
Switch# show issu state [detail]
Step 4
Switch# show redundancy [states]
This example shows how to initiate an ISSU upgrade process using the issu changeversion command on
slot number 5, the slot for the current active supervisor engine. The show issu state detail and show
redundancy command output is included to show the supervisor state before and after the upgrade
procedure.
The success messages included in the output below is displayed after some delay because the ISSU
Note
upgrade procedure progresses through the ISSU states.
Switch> enable
Switch# show issu state detail
Software Configuration Guide—Release IOS XE 3.6.0SG and IOS 15.2(2)SG
7-30
Slot = 5
RP State = Active
ISSU State = Init
Operating Mode = Stateful Switchover
Current Image = bootflash:x.bin
Pre-ISSU (Original) Image = N/A
Post-ISSU (Targeted) Image = N/A
Chapter 7
Configuring the Cisco IOS XE In Service Software Upgrade Process
Purpose
Enables privileged EXEC mode.
Enter your password if prompted.
Initiates a single-step complete upgrade process cycle.
Performs the logic of the four standard commands (issu
loadversion, issu runversion, issu acceptversion, and issu
commitversion) without user intervention.
active-slot—Defines the active slot number.
new-image—Specifies IOS XE image URL to be upgraded
to.
standby-slot—Defines the standby slot number.
standby-image—Specifies the standby IOS XE image URL.
at hh:mm—Schedules an ISSU upgrade to begin in the future.
Provides an exact time (hh:mm, 24 hour format) in the next 24
hours when the upgrade will occur.
in hh:mm—Schedules an ISSU upgrade to begin in the
future. Provides the number of hours and minutes (hh:mm
format) that will elapse before an upgrade will occur (99:59
max).
quick—Upon switchover, boots the standby supervisor
engine with the new, rather than old, image for faster
upgrade.
Displays the state of the during the ISSU process. At this
point in the ISSU process, use this command to check that
the standby supervisor engine is loaded and is in SSO mode.
Displays redundancy facility state information.
OL-30933-01

Advertisement

Table of Contents
loading

Table of Contents