NEC Univerge SV9100 Hardware Manual page 5

Hide thumbs Also See for Univerge SV9100:
Table of Contents

Advertisement

UNIVERGE SV9100
___________________________________________________________________________________
Section 2
Section 3
___________________________________________________________________________________
___________________________________________________________________________________
System Hardware Manual
System Hardware Manual
1.1.2.4
1.1.3
Install Grounding on 19" Chassis ............................................. 3-13
1.1.4
1.1.5
Install AC Power Cords on 19" Chassis ................................... 3-15
1.1.6
1.1.7
Install Additional Blades 19" Chassis ....................................... 3-16
1.1.8
Apply Power to the 19" Chassis ............................................... 3-16
1.2
Installing the 9.5" Base (CHS2UG) Chassis .............................. 3-16
1.2.1
Install Grounding on 9.5" Chassis ............................................ 3-17
1.2.2
1.2.3
1.2.4
1.3
Installing the 9.5" Chassis ......................................................... 3-18
Wall Mounting the Chassis ....................................................... 3-18
2.1
Wall Mounting the 19" (CHS2UG) Chassis ............................... 3-18
2.1.1
CHS2UG Chassis Wall Mount Installation ............................... 3-18
2.2
Wall Mounting the 9.5" Chassis ................................................. 3-25
2.2.1
2.2.2
2.2.2.1
2.2.2.2
Floor Mounting the Chassis ..................................................... 3-36
3.1
Floor Mounting the 19" (CHS2UG) Chassis .............................. 3-36
3.1.1
CHS2UG Chassis Installation .................................................. 3-36
3.1.2
Multiple CHS2UG Chassis Installation ..................................... 3-39
Box 3-29
Wall Mounting the CHS2UG with the CHS2UG B Small Batt Box
3-31
Issue 1.2
- iii
iii

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents