Floor Mounting The Chassis; Floor Mounting The 19" (Chs2Ug) Chassis; Chs2Ug Chassis Installation - NEC Univerge SV9100 Hardware Manual

Hide thumbs Also See for Univerge SV9100:
Table of Contents

Advertisement

Issue 1.2
F
S
3
LOOR
ECTION
3.1
3 - 36
Figure 3-46 Wall Mount – Lower Side (Small Batt Box)
6.
7.
8.
M
OUNTING THE

Floor Mounting the 19" (CHS2UG) Chassis

The CHS2UG controlling and expansion chassis can be mounted on the floor
using the CHS BASE UNIT and the CHS2UG JOINT BRACKET KIT.
3.1.1

CHS2UG Chassis Installation

1.
Use the template shown in below for required spacing before drilling
Align the upper and lower bracket holes with the heads of
anchor bolts mounted on the wall and slide downward.
Connect grounding wire to chassis. Refer to Chapter 4
paragraph
1.3 Installing the 9.5" Chassis on page 3-18
complete details on grounding the system.
Refer for installation of the power cord to Chapter 6
paragraph
2.1 Installation and Safety Precautions on page
4-3
for installation of blades.
C
HASSIS
UNIVERGE SV9100
Installing the SV9100 Chassis
for

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents