Battery Connection; Installing The Internal Batteries 19" (Chs2Ug) Chassis - NEC Univerge SV9100 Hardware Manual

Hide thumbs Also See for Univerge SV9100:
Table of Contents

Advertisement

UNIVERGE SV9100
B
S
6
ATTERY
ECTION
Two types of battery connection provide battery life during a power failure, the internal
battery and an external battery with CHS LARGE BATT BOX.
6.1
System Hardware Manual
7.
Refer to
1.1.5 Install AC Power Cords on 19" Chassis on page 3-15
continue installation of the chassis or, Chapter 6 paragraph
and Safety Precautions on page 4-3
C
ONNECTION

Installing the Internal Batteries 19" (CHS2UG) Chassis

An internal battery source using two batteries can be installed using the CHS2UG
BATT MTG KIT (mounting kit) and CHS2UG BATT CABLE INT (internal cabling).
CHS2UG BATT MTG KIT (Backup time = 10 Minutes/24 Terminals)
1.
Power down the CHS2UG chassis
2.
Disconnect AC power and grounding cable from rear of chassis.
3.
Remove screws from battery access panel on rear of chassis.
Figure 3-68 Removing Battery Access Panel
for installation of blades.
Ensure the CHS2UG chassis is powered OFF.
Issue 1.2
to
2.1 Installation
3 - 53