Toshiba GR200 Series Instruction Manual page 111

Line differential protection ied
Hide thumbs Also See for GR200 Series:
Table of Contents

Advertisement

6F2S1914 (0.49)
currents. Either Block-3P or Block-PerP should be set for the scheme switch [OCSTUB-2fBlk]:
the Block-3P is used when the trip signal should be blocked when the 2f is observed in three-
phase; whereas the Block-PerP is used when the trip signal should be blocked when 2f is
observed in a phase. The user can program a block signal using PLC connection point
"STUBOC_BLOCK".
If an STUB-OC operation test is required in Stub protection area, the user can have a
test by setting [STUB-Test]=On. Consequently, the user can examine the function regardless
of the DS condition in the stub area.
GRL200 (Soft 033 & 037)
- 88 -