Receiving "Select command Off" by PLC function
(vi)
Figure 4.1-9 outlines the reception of the select command 'Off ' by the PLC function.
Wait for a command
Selection logics
Select command On from remote-end
Select command Off from remote-end
Select command On from front panel
Select command Off from front panel
Select command On by the PLC
function
Select command Off by PLC
function
PLC logic programmed
by the user
Input signal from the PLC function
Figure 4.1-12 shows the select logic when a "Select command Off (PLC-OFF-Control)" signal
is generated by the PLC function. There are two input points for the reception of this signal,
like in the signal "Select command On (PLC-On-Control)" where four are available. That is, if
interlock
checking
DEV01_OP_INTERLOCK). Alternatively, if the interlock-check is not required, use the
connection point (PLC#2; e.g., DEV01_OP_COMMAND). PLC#1 and PLC#2 is shown Table
4.1-3.
Selection logic
Figure 4.1-11 Outline of select command 'Off'
is
required,
- 628 -
Failed
Select
Signal output
decision
Success
use
the
connection
6F2S1914 (0.49)
Wait for a next command
Cancel logic
Cancel command
Cancel logic
Operate logic
Operate command
Operate logic
point
(PLC#1:e.g.,
GRL200 (Soft 033 & 037)