Siemens SINAMICS G120 Operating Instructions Manual page 90

Low voltage converters built-in and wall mounting units with cu230p-2 control units
Hide thumbs Also See for SINAMICS G120:
Table of Contents

Advertisement

Installing
4.4 Connecting the line supply and motor
Connecting the mains supply and motor, frame sizes FSA ... FSC
Procedure
To connect the mains supply and motor to FSA ... FSC Power Modules, proceed as follows:
1. Remove the front cover of the Power Module.
2. Remove the cable gland plate from the bottom of the inverter.
Figure 4-13
90
Diameters of the drill holes in the cable gland plates:
20.5 mm
Control cables
20.5 mm
Mains and motor cables, FSA
25.5 mm
Mains and motor cables, FSB
32.5 mm
Mains and motor cables, FSC
Bolting plates for PM230, FSA to FSC
Converter with the CU230P-2 Control Units
Operating Instructions, 09/2017, FW V4.7 SP9, A5E34257946B AE