Siemens SINAMICS G120 Operating Instructions Manual page 8

Low voltage converters built-in and wall mounting units with cu230p-2 control units
Hide thumbs Also See for SINAMICS G120:
Table of Contents

Advertisement

Table of contents
4.3.4
4.3.5
4.3.6
4.3.7
4.3.8
utilizing push-through technology...........................................................................................79
4.4
Connecting the line supply and motor....................................................................................83
4.4.1
TN line system.......................................................................................................................84
4.4.2
TT line system........................................................................................................................85
4.4.3
IT system................................................................................................................................86
4.4.4
Protective conductor..............................................................................................................87
4.4.5
Connecting the inverter with the PM230 Power Module IP55................................................89
4.4.6
Connecting the inverter with the PM230 Power Module........................................................94
4.4.7
Connecting the inverter with the PM330 Power Module........................................................96
4.4.8
Connecting the inverter with the PM240P-2 Power Module...................................................97
4.4.9
Connecting an inverter with the PM240-2 Power Module......................................................99
4.4.10
Connecting the inverter with the PM250 Power Module......................................................103
4.4.11
4.5
Connecting the interfaces for the inverter control................................................................106
4.5.1
Plugging the Control Unit onto the Power Module...............................................................106
4.5.2
Overview of the interfaces....................................................................................................109
4.5.3
Fieldbus interface allocation.................................................................................................110
4.5.4
Terminal strips......................................................................................................................111
4.5.5
Factory interface settings.....................................................................................................113
4.5.6
Default setting of the interfaces............................................................................................115
4.5.7
Digital inputs and outputs on the PM330 Power Module.....................................................131
4.5.8
Wiring terminal strips............................................................................................................133
4.5.9
Connecting the temperature contact of the braking resistor................................................136
4.5.10
Connecting the inverter to PROFINET.................................................................................137
4.5.10.1
Communication via PROFINET IO and Ethernet.................................................................137
4.5.10.2
Connecting the PROFINET cable to the inverter.................................................................138
4.5.10.3
What do you have to set for communication via PROFINET?.............................................139
4.5.10.4
Installing GSDML.................................................................................................................140
4.5.11
Connecting the inverter to PROFIBUS.................................................................................140
4.5.11.1
Connecting the PROFIBUS cable to the inverter.................................................................141
4.5.11.2
What do you have to set for communication via PROFIBUS?.............................................141
4.5.11.3
Installing the GSD................................................................................................................142
4.5.11.4
Setting the address..............................................................................................................143
5
Commissioning.........................................................................................................................................145
5.1
Commissioning guidelines...................................................................................................145
5.2
Tools to commission the inverter.........................................................................................146
5.3
Preparing for commissioning................................................................................................147
5.3.1
Collecting motor data...........................................................................................................147
5.3.2
Forming DC link capacitors..................................................................................................149
5.3.3
Inverter factory setting..........................................................................................................151
5.4
Quick commissioning using the BOP-2 operator panel........................................................153
5.4.1
Inserting the BOP-2..............................................................................................................153
5.4.2
Start quick commissioning and select the application class.................................................154
5.4.3
Quick commissioning with application classes.....................................................................160
8
Converter with the CU230P-2 Control Units
Operating Instructions, 09/2017, FW V4.7 SP9, A5E34257946B AE

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Sinamics g120p

Table of Contents