Nokia Check Point IP2450 Installation Manual page 34

Security platform
Table of Contents

Advertisement

2
Installing the Check Point IP2450 Appliance
Caution
To help guard against electrostatic discharge damage, make sure you are properly
grounded by using a grounding wrist strap and following the instructions provided with
the wrist strap before you handle the components or open the appliance. The
grounding plug on the front of the appliance (shown in
chassis grounding point. If you do not have a grounding wrist strap, make sure you are
properly grounded before you touch any electronic component.
a. Loosen the four chassis tray assembly retaining screws from the front panel of the
b. Slide the chassis tray assembly forward and pull it entirely out of the appliance.
c. Place the chassis tray assembly on a properly grounded surface.
5. Adjust the front mounting brackets on the side of the appliance if necessary.
34
appliance.
HDD A
HARD DRIVE
STATUS
POWER
ACTIVITY
HOT SWAP
HOT SWAP
HARD DRIVE
STATUS
POWER
HOT SWAP
ACTIVITY
HOT SWAP
HDD B
CONSOLE
AUX
AUX2
HA RD
DR IV
E
ST AT
HD D
US
A
AC TI
VI TY
HA RD
DR IV
PO WE
E
R
HO T
SW AP
ST AT
US
HO T
AC TI
SW AP
VI TY
PO WE
R
HO T
SW AP
HO T
SW AP
HD D
B
CO NS
OL E
SU B
SL OT
1
AU X
LI NK
AC T
AU X2
LI NK
SL OT
SU B
1
SL OT
AC T
1
SU B
SL OT
2
LI NK
LI NK
AC T
AC T
LI NK
SL OT
SU B
SL OT
3
AC T
2
LI NK
SL OT
AC T
2
1
2
3
4
Figure 1
SUB SLOT 1
LINK
LINK
ACT
ACT
SUB SLOT 1
LINK
ACT
SLOT 3
PC CARD
Chassis tray assembly screws
I P 2
PO WE
4 5 0
R
FI O
CA RR
HO T
IE R
SW AP
RE AD
Y
RE QU
ES T
PO WE
R
FI O
CA RR
HO T
IE R
SW AP
RE AD
Y
SL OT
RE QU
ES T
4
RE SE
T
Check Point IP2450 Security Platform Installation Guide
on page 17) provides a
IP2450
SLOT 1
SUB SLOT 2
FIO CARRIER
POWER
HOT SWAP
LINK
LINK
ACT
ACT
READY
REQUEST
SUB SLOT 2
FIO CARRIER
POWER
HOT SWAP
LINK
ACT
READY
REQUEST
SLOT 2
SLOT 4
1
2
3
4
RESET
00616.1
00637

Advertisement

Table of Contents
loading

Table of Contents