Commissioning check list

Mechanical installation

1
Drive installed according to the instructions in the
2
Drive securely fastened to the floor (if applicable)
3
Fan unit or fan units installed
4
Visual inspection:
- no badly affixed or damaged components
- no foreign objects inside cabinet
- no dirt, dust and humidity inside cabinet

Electrical installation

1
Types and cross-sections of control cables suitable for the signal type and signal level
2
Types and cross-sections of power cables selected according to the
fication
3
Pulse encoder cable screens connected to screen grounding point and not
connected directly to the pulse encoder interface (only applicable for drives with pulse
encoder interface)
4
Cable entry prepared according to the instructions in the
5
All control cable screens and conductors are connected according to the instructions of
the
User
manual, appropriately labeled, and the customer connections are completed.
6
Heating cable (if supplied) installed according to the instructions in the
7
Ground cable of drive securely connected at both ends
8
Input transformer and motor cables not connected at both ends (cables and drive must
be meggered before connection)
5k A UM
User manual
3BHS221906 ZAB E01 Rev. D