ABB
6.7
Power cables, ground cables, equipotential bonding conductor
6.7.1
Further information
6.7.2
Preparing the cable entries and the cables
Determining the cable length
5k A UM
See layout drawing in
on:
■
Project-specific cable entry
■
Distance between point of cable entry and termination busbars
■
Busbar and fastening hole dimensions
■
Busbar designations
See
Appendix D – Wiring diagrams
■
Conventions for cross-references and device identification
NOTICE
Risk of damage or malfunction!
Waste inside the cabinet can cause damage or malfunction.
If possible, do not cut cables inside the terminal compartment. Retrieve
any waste which accidentally dropped into the cabinet.
1
Determine the required length of a cable between the point of entry
and the connection point inside the cabinet.
2
Cut the cable to the required length before connection.
3BHS221906 ZAB E01 Rev. D
Appendix C – Mechanical drawings
for information on:
Chapter 6 - Electrical installation
for information
6-7 (22)