Troubleshooting
7.
Pull out the faulty module.
8.
Check that the new module has a correct identity number.
9.
Check that the springs on the card rail are connected to the corresponding metallic area
on the circuit board when the new module is inserted.
10. Reassemble the IED.
If the IED has been calibrated with the system inputs, the calibration procedure must be
performed again to maintain the total system accuracy.
14.4

Repair support

If an IED needs to be repaired, the whole IED must be removed and sent to an ABB Logistic
Center. Before returning the material, an inquiry must be sent to the ABB Logistic Center.
e-mail: offer.selog@se.abb.com
14.5

Maintenance

The IED is self-supervised. No special maintenance is required.
Instructions from the power network company and other maintenance directives valid for
maintenance of the power system must be followed.
206
Remove the IED from the panel if necessary.
Remove the rear plate of the IED.
Remove the front plate.
Remove the screws of the transformer input module, both front and rear.
© Copyright 2017 ABB. All rights reserved
1MRK 511 403-UEN E
M11768-3 v3
M11769-3 v2
Bay control REC670
Commissioning manual

Advertisement

Table of Contents
loading

This manual is also suitable for:

Relion rec670

Table of Contents