1MRK 511 403-UEN E
1.
Connect single-phase or three-phase test set to inject the operating voltage. The
injection is done across the measuring branch.
2.
Increase the voltage and make note of the operate value
testing and without trip of the test set.
3.
Connect the trip contact to the test set to stop the test set for measurement of trip
times below.
4.
Reduce the voltage slowly and make note of the reset value. The reset value must be high
for this function.
Check the operating time by injecting a voltage corresponding to 1.2 ˣ
5.
note of the measured trip time.
If required, verify the trip time at another voltage. Normally 2 ˣ
6.
7.
If used, measure the alarm level operating value. Increase the voltage and make note of
the operate value
8.
Measure the operating time on the alarm output by connecting the stop of the test set to
an output from
9.
Check that trip and alarm outputs operate according to the configuration logic.
10.
Finally check that start and alarm information is stored in the event menu and if a serial
connection to the SA is available verify that the correct and only the required signals are
presented on the local HMI and on the SCADA system.
11.3.1.2

Completing the test

continue to test another function or end the test by changing the
Restore connections and settings to their original values, if they were changed for testing
purposes.
11.4

Current protection

11.4.1
Instantaneous phase overcurrent protection 3-phase output
PHPIOC
Prepare the IED for verification of settings outlined in Section
settings".
Values of the logical signals for PHPIOC are available on the local HMI under Main menu/
Tests/Function status/Current protection/InstPhaseOverCurrent(50,3I>>)/
PHPIOC(50;3I>>):x, where x = 1, 2, and 3.
The Signal Monitoring in PCM600 shows the same signals that are available on the local HMI.
To verify the settings the following fault type should be tested:
Phase-to-earth fault
Bay control REC670
Commissioning manual
The required trip and alarm voltage, as well as the used stabilizing
resistance value must be set in the function. Note as well that used CT
input in the IED must have ratio set as 1:1. This is essential for the
measurement of the expected value. Normally a slightly higher operating
value is no problem as the sensitivity is not influenced much.
U>Alarm . This is done with manual test and without trip of the test set.
tAlarm . Inject a voltage 1.2 ˣ U>Alarm and measure the alarm time.
Information on how to use the event menu is found in the operator's manual.
© Copyright 2017 ABB. All rights reserved
Testing functionality by secondary injection
U>Trip . This is done by manual
U>Trip level. Make
U>Trip is selected.
TESTMODE setting to Off .
"Preparing the IED to verify
Section 11
SEMOD55257-73 v4
SEMOD53531-1 v1
M11754-3 v8
93