ABB Relion 670 Series Commissioning Manual page 56

Bay control version 2.2 iec
Hide thumbs Also See for Relion 670 Series:
Table of Contents

Advertisement

Section 4
Starting up
IEC13000060 V1 EN-US
Figure 6:
5.
Select Use the following IP address and define
port is used and if the
Figure
IEC13000062 V1 EN-US
Figure 7:
6.
Use the
7.
Close all open windows and start PCM600.
50
Select the TCP/IPv4 protocol and open Properties
IP address is not set to be obtained automatically by the IED,see
7. The IP address must be different from the IP address chosen for the IED.
Select: Use the following IP address
ping command to verify connectivity with the IED.
© Copyright 2017 ABB. All rights reserved
IEC13000060-1-en.vsd
IP address and Subnet mask if the front
IEC13000062-1-en.vsd
1MRK 511 403-UEN E
Bay control REC670
Commissioning manual