Completing The Test; Overfrequency Protection Saptof; Verifying The Settings - ABB Relion 670 Series Commissioning Manual

Bay control version 2.2 iec
Hide thumbs Also See for Relion 670 Series:
Table of Contents

Advertisement

1MRK 511 403-UEN E
Verification of the low voltage magnitude blocking
1.
Check that the IED settings are appropriate, for example the
the
2.
Supply the IED with three-phase voltages at rated values.
3.
Slowly decrease the magnitude of the applied voltage, until the BLKDMAGN signal
appears.
4.
Note the voltage magnitude value and compare it with the set value
5.
Slowly decrease the frequency of the applied voltage, to a value below
6.
Check that the START signal does not appear.
7.
Wait for a time corresponding to
11.6.1.2

Completing the test

continue to test another function or end the test by changing the
Restore connections and settings to their original values, if they were changed for testing
purposes.
11.6.2

Overfrequency protection SAPTOF

Prepare the IED for verification of settings outlined in Section
settings".
11.6.2.1

Verifying the settings

Verification of START value and time delay to operate
1.
Check that the IED settings are appropriate, for example the start value and the time
delay.
2.
Supply the IED with three-phase voltages at their rated values and initial frequency.
3.
Slowly increase the frequency of the applied voltage with a 40 mHz step, applying it for a
period that is 10% longer than
4.
Note the operate value and compare it with the set value.
5.
Decrease the frequency to rated operating conditions.
6.
Check that the START signal resets.
7.
Set the frequency to 20 mHz under the operate value.
8.
Increase the frequency with a 40 mHz step, applying it for a period that is 10% longer
than
9.
Measure the time delay for the TRIP signal, and compare it with the set value. Note that
the measured time consists of the set value for time delay plus minimum operate time of
the start function (80 - 90 ms).
Extended testing
1.
The test above can be repeated to check the time to reset.
Verification of the low voltage magnitude blocking
1.
Check that the settings in the IED are appropriate, for example the
the
2.
Supply the IED with three-phase voltages at their rated values.
3.
Slowly decrease the magnitude of the applied voltage, until the BLKDMAGN signal
appears.
4.
Note the voltage magnitude value and compare it with the set value.
Bay control REC670
Commissioning manual
tDelay .
tDelay .
tDelay .
© Copyright 2017 ABB. All rights reserved
tDelay , make sure that the TRIP signal does not appear.
tDelay .
Testing functionality by secondary injection
StartFrequency , UMin , and
UMin .
StartFrequency .
TESTMODE setting to Off .
"Preparing the IED to verify
StartFrequency and
Section 11
M16289-39 v7
M16289-57 v5
M16290-2 v7
M16290-12 v2
M16290-14 v6
M16290-28 v4
M16290-34 v6
129

Advertisement

Table of Contents
loading

This manual is also suitable for:

Relion rec670

Table of Contents