Floor Brace; Flange-Head Bolts (5/16 X 1 Inch); Flange Locknut (5/16 Inch) - Toro 07161 Installation Instructions Manual

Ball cage kit workman gtx utility vehicle
Table of Contents

Advertisement

Figure 13
Left Side Shown
1. Plastic rivet (10)
2. Rubber cover
3
Installing the Floor Braces
Parts needed for this procedure:
2

Floor brace

20

Flange-head bolts (5/16 x 1 inch)

20

Flange locknut (5/16 inch)

Drilling the Frame Channels
Figure 14
1.
Align the floor brace to the machine as follows:
Align the flanges of the floor brace flush
to the side frame channel, forward floor
channel, and rear frame channel of the
machine
(Figure
Align the floor brace parallel to the floor
(Figure
15).
3. Cable tie
15).
g217566
Marking the forward floor channel
1. Front of the machine
2. Forward floor channel
3. Floor brace
2.
Clamp the floor brace to the side frame channel
and floor channels.
3.
Using the floor brace as a template, mark the
hole locations on the side frame channel and
floor channels
17).
g237478
Marking the side frame channel
1. Front of the machine
2. Forward floor channel
3. Floor brace
8
Figure 15
4. Side frame channel
5. Rear floor channel
(Figure
15,
Figure
16, and
Figure 16
4. Side frame channel
5. Rear floor channel
g237471
Figure
g237473

Advertisement

Table of Contents
loading

Table of Contents