Table 3.10 Construction Situation Checklist (Continued)
Check Items
Ground line standard
Ground bar ↔ System
Ground line cabling status
Termination treatment of the
ground line (pressure
terminal)
Feeder line cabling and
locking status
ANT installation and
attachment status
Connection and finish status
Feeder tag
Power cable tag
Ground table tag
Attachment status of the
label for the real-name
construction system
- Indoor: wall side of the gate
side
- Outdoor: inside of the
cover of the distribution box
Cable duct bolt's attachment
status
Feeder inlet finish treatment
status
Status of inside/outside of
the system and vicinity of the
base station
Mobile WiMAX/TD-LTE RRH-2WB Installation Manual/Ver.2.0
Criteria
Visual inspection
Visual inspection
Cabling status check
Visual inspection
Beauty, robustness and
Bending
Visual inspection
(ANT bar's vibration
status)
Beauty and robustness
Visual inspection
(Information mentioned:
length, loss value,
location)
Visual inspection
(Power Identification)
Visual inspection
Visual inspection
(size and material)
Visual inspection
Visual inspection (check
if the rear part is
attached)
Visual inspection
Result
Remarks
Pass
Fail
3-31