Installation Test - Samsung RRH-2WB Installation Manual

Mobile wimax/td-lte
Table of Contents

Advertisement

CHAPTER 3. Connecting Cables

3.6 Installation Test

If the installation of the system is complete, progress the installation test to check the status
of the system. If there is any problem, restore the system and write out the failure table.
Category
System
Installation
Power
Acceptance
3-30
Table 3.10 Construction Situation Checklist
Check Items
System fixing status
(vertical and horizontal)
System arrangement status
Locking status and standard
compatibility of bolts/nuts/
washers
External wiring and other
wirings
Cable installation between
systems
External connector
connection
Other appurtenant work
(Cable duct installation and
others)
Equipment power line
standards
Power terminal panel ↔
System
Cabling Status
Damage of cable sheath
Connection status of system
power connector
System input voltage
(BATT voltage)
Cabling status
Criteria
Horizontal and vertical
locations
Horizontal and vertical
locations
Visual inspection and
magnet test
Visual inspection for
twist, array and
arrangement
Checking twist, distortion
and installation status
Visual inspection to
check poor contact
(tightening status)
Visual inspection
Visual inspection
Visual inspection
Visual inspection for
twisted or entangled
status
Visual inspection
Visually inspect to ensure
that the power connector
is properly connected,
and that there are no
gaps or movement.
Measurement by digital
meter (voltmeter)
Visual inspection
(Flexible, Vinyl hose)
© SAMSUNG Electronics Co., Ltd.
Result
Remarks
Pass
Fail