Chapter 3. Connecting Cables; Work Flow For Cabling - Samsung RRH-2WB Installation Manual

Mobile wimax/td-lte
Table of Contents

Advertisement

CHAPTER 3.

3.1 Work Flow for Cabling

The cabling sequence is as follows.
Cable Path Inspection
Connector Attachment
Identification Tag Attachment
Cabling Workflow
The sequence of cable cutting and installation of the cable workflow can be
changed depending on the field situation such as 'cutting after installing' or
'installing after cutting'.
Considerations when Cutting the Cable after Installation
When cutting the cable after installation, make sure that the connector is
disconnected. Installation of the cable with the connector connected to the system
may cause contact failure or damage to the connector assembled to the system
and the cable due to cable tension or the operator's mistakes.
© SAMSUNG Electronics Co., Ltd.
Connecting Cables
Cable Cutting
Cable Installation
Cable Binding
Figure 3.1 Work Flow for Cabling
Mobile WiMAX/TD-LTE RRH-2WB Installation Manual
When assembling the
connector at the site
Connector Assembly
3-1

Advertisement

Table of Contents
loading

Table of Contents