2. INSTALLATION
2.1 Installation direction and clearances
CAUTION
(1) Installation clearances of the servo amplifier
(a) Installation of one servo amplifier
Cabinet
10 mm
or more
(Note 2)
Note 1. For the 11 kW to 22 kW servo amplifiers, the clearance between the bottom and the ground will be 120 mm or more.
2. When mounting MR-J4-500_-RJ, maintain a minimum clearance of 25 mm on the left side.
The equipment must be installed in the specified direction. Otherwise, it may
cause a malfunction.
Leave specified clearances between the servo amplifier/MR-D30 and the cabinet
walls or other equipment. Otherwise, it may cause a malfunction.
POINT
For the installation direction and clearances of the MR-J4-DU_-RJ, refer to "MR-
CV_/MR-CR55K_/MR-J4DU_(-RJ) Instruction Manual".
40 mm or more
Servo amplifier
10 mm
or more
40 mm
or more
(Note 1)
Cabinet
Wiring allowance
80 mm
or more
2 - 2
Top
Bottom