Cable Connections (-48 V Dc, Six Rru3908S+Six Rru3804S); Table 15-12 Cable Description - Huawei DBS3900 Installation Manual

Indoor centralized rack (icr) dual-mode base station
Hide thumbs Also See for DBS3900:
Table of Contents

Advertisement

15 Installing Cables
Table 15-12

Table 15-12 Cable description

15.2.11 Cable Connections (-48 V DC, Six RRU3908s+Six RRU3804s)

This section describes all the cable connections in the dual-mode and triple-mode scenarios when
six RRU3908s and six RRU3804s are configured and the -48 V DC power supply is provided.
Cable Connections in the Dual-Mode Scenario
Figure 15-13
15-28
describes the cables.
Power cable
Jumper
NOTE
The E1/T1 cable or FE/GE cable is used according to the on-site requirements.
shows the cable connections in the dual-mode scenario.
Huawei Proprietary and Confidential
Copyright © Huawei Technologies Co., Ltd.
CPRI cable
PGND cable
DBS3900(ICR)
Installation Guide
GPS clock
signal cable
E1/T1 cable
or FE/GE
cable
Issue 01 (2011-03-30)

Advertisement

Table of Contents
loading

Table of Contents