Figure 8-12 Drilling Holes; Figure 8-13 Installing The Support - Huawei DBS3900 Installation Manual

Indoor centralized rack (icr) dual-mode base station
Hide thumbs Also See for DBS3900:
Table of Contents

Advertisement

8 Installing the IFS06

Figure 8-12 Drilling holes

Take proper safety measures before drilling holes to protect your eyes and respiratory tract
against the dust.
Step 3 Install the support for installing the ESD floor, as shown in

Figure 8-13 Installing the support

(1) M12x70 bolt
8-8
CAUTION
(2, 5) Spring washer 12
Huawei Proprietary and Confidential
Copyright © Huawei Technologies Co., Ltd.
Figure
8-13.
(3,6) Flat washer 12
DBS3900(ICR)
Installation Guide
(4) M12x60 bolt
Issue 01 (2011-03-30)

Advertisement

Table of Contents
loading

Table of Contents