Figure 7-3 Moving Down The Adjustable Beam - Huawei DBS3900 Installation Manual

Indoor centralized rack (icr) dual-mode base station
Hide thumbs Also See for DBS3900:
Table of Contents

Advertisement

DBS3900(ICR)
Installation Guide

Figure 7-3 Moving down the adjustable beam

Step 4 Fit the tabs of the cable rack into the corresponding slots on the columns of the IFS06, as shown
in
Figure
Issue 01 (2011-03-30)
7-4.
Huawei Proprietary and Confidential
Copyright © Huawei Technologies Co., Ltd.
7 Assembling the IFS06
7-3