DBS3900(ICR)
Installation Guide
Figure 13-7 Reinstalling the mounting ears
Step 2 Install the power equipment (DC/DC) into the corresponding slot in the lower-level IMB03, and
then tighten the four M6x16 bolts on the panel, as shown in
Figure 13-8 Installing the power equipment (DC/DC) in the IMB03
Step 3 Install the PGND cable, as shown in
Issue 01 (2011-03-30)
Figure
Huawei Proprietary and Confidential
Copyright © Huawei Technologies Co., Ltd.
13 Installing Devices in the IMB03
Figure
13-9.
13-8.
13-5