Performing The Dbs3900 Power-On Check - Huawei DBS3900 Installation Manual

Indoor centralized rack (icr) dual-mode base station
Hide thumbs Also See for DBS3900:
Table of Contents

Advertisement

DBS3900(ICR)
Installation Guide
17
After all devices are installed, you need to check the power-on status of the BBU and RRU.
l
l
Checking the Power-On Status of the BBU
Figure 17-1
Issue 01 (2011-03-30)
Performing the DBS3900 Power-On
CAUTION
The DBS3900 must be powered on within seven days after it is unpacked, and the period
for which the DBS3900 remains powered-off during maintenance must not exceed 48
hours.
The RRU must be powered on within 24 hours after it is unpacked, and the period for which
the RRU remains powered-off during maintenance must not exceed 24 hours.
shows the BBU power-on check process.
Huawei Proprietary and Confidential
Copyright © Huawei Technologies Co., Ltd.

17 Performing the DBS3900 Power-On Check

Check
17-1

Advertisement

Table of Contents
loading

Table of Contents