Cisco 6509 - Catalyst Chassis Switch Installation Manual page 89

Installation guide
Table of Contents

Advertisement

Chapter 2
Preparing for Installation
Figure 2-1
ESD ground
strap
In addition, follow these guidelines when handling modules:
Handle carriers by available handles or edges only; avoid touching the printed circuit boards or
connectors.
Place a removed component board-side-up on an antistatic surface or in a static shielding container.
If you plan to return the component to the factory, immediately place it in a static shielding
container.
Never attempt to remove the printed circuit board from the metal carrier.
For safety, periodically check the resistance value of the antistatic strap. The measurement should be
Caution
between 1 and 10 megohm (Mohm).
OL-5781-04
Attaching the ESD Wrist Strap Clip to the System Ground Lug Screw
Clip
Screw
Slide clip
behind screw
Clip installed
behind screw
WS-X6 K-SUP 2-2GE
CONSOL E
PORT
MODE
CONSOL E
SUPER VISOR 2
PCMCIA
OSM-4OC 12 POS-SI
4 PORT OC-12 POS
SM IR
OSM-4OC 12 POS-SI
4 PORT OC-12 POS
SM IR
Grounding lug
Side view of
grounding lug
System ground
connector
Switch
Load
100%
PORT 1
PORT 2
EJECT
1%
Catalyst 6500 Series Switches Installation Guide
Site Requirements
2-9

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Ws-c6506Catalyst 6500 series

Table of Contents