Cisco 6509 - Catalyst Chassis Switch Installation Manual page 123

Installation guide
Table of Contents

Advertisement

Chapter 3
Installing the Switch
Loosen the two captive installation screws on the front panel. (See
Step 3
Figure 3-12 Removing the Front Panel
Remove the front panel, and set it aside.
Step 4
Attach the interface cables to the modules, and route the cables through the cable guide.
Step 5
Step 6
Install the front panel by hooking the top of the front panel over the cable guide.
Tighten the two captive installation screws. (See
Step 7
OL-5781-04
FAN
STATU S
FAN
1
FAN
2
Captive installation screws
Installing the Cable Management System (Catalyst 6509-NEB-A Switch Only)
Figure
3-12.)
Catalyst 6500 Series Switches Installation Guide
Figure
3-12.)
3-19

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Ws-c6506Catalyst 6500 series

Table of Contents