Chapter 5
Installing the IDS-4235 and IDS-4250
Recommended Tools and Supplies
Rack Kit Contents
Marking the Rack
Cisco Intrusion Detection System Appliance and Module Installation and Configuration Guide Version 4.1
78-15597-02
Marking the Rack, page 5-35
•
•
Installing the Slide Assemblies in the Rack, page 5-36
You need the following tools and supplies to install the appliance in a two-post,
open-frame relay rack:
•
#2 Phillips screwdriver
11/32-inch wrench or nut driver (if changing bracket to flush-mount
•
configuration)
Masking tape or felt-tip pen to mark the mounting holes
•
The two-post rack kit includes:
•
One pair of slide assemblies (two-post)
One cable-management arm
•
One status-indicator cable assembly
•
•
Two stop blocks
Eight 12-24 x 0.5-inch pan-head Phillips screws
•
•
Releaseable tie wraps
You must allow 1 RU (44 mm or 1.75 inches) of vertical space for each appliance
you install in the two-post rack.
Installing the Accessories
5-35