Preparing For Installation; Safety; Site Requirements - Cisco SCE8000 Installation And Configuration Manual

Cisco systems router installation and configuration guide
Hide thumbs Also See for SCE8000:
Table of Contents

Advertisement

Preparing for Installation

Blank faceplates and cover panels serve three important functions: they prevent exposure to
Warning
hazardous voltages and currents inside the chassis; they contain electromagnetic interference (EMI)
that might disrupt other equipment; and they direct the flow of cooling air through the chassis. Do not
operate the system unless all cards, faceplates, front covers, and rear covers are in place.
Preparing for Installation

Safety

This equipment must be grounded. Never defeat the ground conductor or operate the equipment in the
Warning
absence of a suitably installed ground conductor. Contact the appropriate electrical inspection
authority or an electrician if you are uncertain that suitable grounding is available.
Read the installation instructions before connecting the system to the power source.
Warning
This product requires short-circuit (overcurrent) protection, to be provided as part of the building
Warning
installation. Install only in accordance with national and local wiring regulations.

Site Requirements

This section provides site power requirements for the Cisco SCE8000 chassis. You should verify the site
power prior to installation.
Cisco SCE8000 Installation and Configuration Guide, Rel 3.1.7
4-2
Preparing for Installation, page 4-2
Installing the Cisco SCE8000 Chassis in the Rack, page 4-13
Connecting the System Ground, page 4-18
Installing the Power Supplies in the Cisco SCE8000 Chassis, page 4-20
Safety, page 4-2
Site Requirements, page 4-2
Power Connection Guidelines, page 4-4
Preventing Electrostatic Discharge Damage, page 4-3
Environmental Requirements, page 4-3
Power Requirements, page 4-4
Chapter 4
Installing the Cisco SCE8000 Chassis
OL-16478-03

Advertisement

Table of Contents
loading

Table of Contents