Removing and Replacing the Power Supply
If you intend to use an additional system (earth ground), ensure that the system ground connection has
Note
been made. For ground connection installation instructions, see
page
4-18.
Remove the plastic bag attached to the front panel and put aside. This bag contains two plastic terminal
Step 2
block barriers, two cable ties, and two cable holder covers.
Verify that power is off to the DC circuit connected to the power supply you are installing. Grasp both
Step 3
power supply handles, as shown in
sure that the power supply is fully seated in the bay.
Tighten the power supply captive installation screws.
Step 4
Warning
Power supply captive installation screws must be tight to ensure protective grounding continuity.
As the power requirement of the SCE8000 will not exceed 1350W, it is not necessary to connect two
Note
pairs of input wires to each power supply. Should it be desired to connect two pairs of input wires, both
pairs of input wires for one 2700W DC-input power supply must come from the same battery system (A
feed); and both pairs of input wires for the other power supply must come from another battery system
(B feed).
For multiple DC input power supply, each DC input must be protected by dedicated circuit breaker or
Note
fuse. The circuit breaker or fuse should be sized according to the power supply input rating and local or
national electrical code requirements.
Remove the four screws securing the terminal block cover, and slide the cover off of the terminal block.
Step 5
Cisco SCE8000 Installation and Configuration Guide, Rel 3.1.7
9-8
Chapter 9
Figure
9-4. Slide the power supply into the power supply bay. Make
Removal and Replacement Procedures
Connecting the System Ground,