Cisco Firepower 4110 Hardware Installation Manual page 9

Hide thumbs Also See for Firepower 4110:
Table of Contents

Advertisement

Overview
Figure 2: Firepower 4100 Package Contents
1
Firepower 4100 chassis
3
Two power cords (country-specific)
See
a list of supported power cords.
5
Two slide rails
7
Artesyn tie wrap
9
Two M3 x 6 mm screws used to secure the inner
slide rail to the chassis
11
Two slide rail locking brackets
13
One ground lug #6 AWG, 90 degree, #10 post
15
Cisco Firepower 4100
This document has a URL pointing to the
hardware installation guide, a URL pointing the
regulatory and safety guide, and a QR code and
URL pointing to the Getting Started Guide.
Power Cord Specifications, on page 32
Cisco Firepower 4110, 4120, 4140, and 4150 Hardware Installation Guide
2
Blue console cable PC terminal adapter
4
10/100/1000BASE-T SFP transceiver
for
6
Tie wrap clamp
8
Flextronics tie wrap
10
Ten 8-32 x 0.375 inch Phillips screws used to
secure the mounting bracket to chassis (six
screws), and the cable management brackets to
the mounting brackets (four screws)
12
Two 10-32 x 0.375 inch screws used to secure
the ground lug
14
Two cable management brackets
Package Contents
5

Advertisement

Table of Contents
loading

This manual is also suitable for:

Firepower 4120Firepower 4140Firepower 4150

Table of Contents