Ground The Chassis - Cisco Firepower 4110 Hardware Installation Manual

Hide thumbs Also See for Firepower 4110:
Table of Contents

Advertisement

Ground the Chassis

Figure 38: Inner Rail Release Clip
1
Inner rail release clip
Outer rail attached to rack post
3
Step 6
Use the captive screws on the front of the mounting brackets to fully secure the chassis to the rack.
What to do next
Ground the chassis. See
Install the FIPS opacity shield if necessary. See
Install the cables according to your software configuration as described in the
Started
Ground the Chassis
Note
Grounding the chassis is required, even if the rack is already grounded. A grounding pad with two threaded
M4 holes is provided on the chassis for attaching a grounding lug. The grounding lug must be Nationally
Recognized Testing Laboratory (NRTL)-listed. In addition, a copper conductor (wires) must be used and the
copper conductor must comply with National Electrical Code (NEC) code for ampacity.
Cisco Firepower 4110, 4120, 4140, and 4150 Hardware Installation Guide
52
Ground the Chassis, on page 52
Guide.
2
Inner rail attached to chassis
for the procedure.
Install the FIPS Opacity Shield, on page 75
Rack-Mount and Ground the Chassis
for the procedure.
Cisco Firepower 4100 Getting

Advertisement

Table of Contents
loading

This manual is also suitable for:

Firepower 4120Firepower 4140Firepower 4150

Table of Contents